Skip to main content
LA TIPPERS
Tipper truck on a Burleigh Heads civil construction site, Gold Coast
Burleigh Heads, QLD 4220

Operated Tipper Hire — Burleigh Heads

$130/hr + GST + 18% fuel surcharge. 4-hour minimum. Mon–Sat 6:00 AM – 5:00 PM. SITRAK G5S 6×4 with HR-licensed driver supplied — not a self-drive rental.

Operated tipper hire across Burleigh Heads civil and commercial sites

Operated tipper hire in Burleigh Heads for civil contractors, commercial builders, and subcontractors working across 4220. SITRAK G5S 6×4 with an HR-licensed driver, mid-size 10m³ tray, ~15-tonne payload — sized for the kind of dig-out, fill-removal and material-delivery work that runs out of Burleigh's commercial and subdivision sites.

We work the Burleigh Heads–Palm Beach–Miami–Varsity Lakes corridor every week. Most of our Burleigh jobs are spoil removal off civil sites, road-base and crushed-rock deliveries to active builds, and end-of-job site cleanups. We're not a self-drive rental and we don't subcontract the work — when you book us, we drive.

Pricing: $130/hr + GST + 18% fuel surcharge, 4-hour minimum. $200 deposit, $2,000 bond. Saturday work included at the standard rate, no after-hours penalty. Itemised GST invoice every job.

How a Burleigh Heads booking actually runs

Text or call with the job details. We'll come back same day with a firm price and the next available slot. Most Burleigh Heads work we book within the week. The truck arrives at the time you booked it — your supervisor signs the SWMS in 2 minutes, the operator starts billing from on-site, and you get an itemised invoice end of day.

For Burleigh's mix of established commercial sites and tighter subdivision blocks, the SITRAK 6×4 is the right size — bigger than a tip truck, smaller than a truck-and-dog. Fits the kerbside access on the older Burleigh streets without you needing to negotiate with neighbours.

What's included in $130/hr

Itemised so you can plug it straight into your project budget. Plus 18% fuel surcharge and GST on top.

  • HR-licensed operator
  • SITRAK G5S 6×4 — ~10m³ bed, ~15-tonne payload
  • Hourly rate ($130) bundles operator labour and the truck
  • All on-site time (4-hour minimum)
  • Saturday work at standard rate
  • $20M public liability cover
  • Itemised GST invoice — every line accounted for

Why operated, not dry hire

Local to Burleigh weekly

We're based in Mermaid Beach (next suburb up) and work Burleigh sites every week. Quick to mobilise, familiar with the local tipping options.

One truck per job, not a fleet roster

Our regular operator shows up. Same operator means consistency between jobs — useful when you're running a multi-stage build.

Right size for Burleigh access

Mid-size 6×4 — gets into the tighter sites a truck-and-dog can't. Useful in older Burleigh streets and subdivision lots with narrow access.

Burleigh Heads & nearby

4220 and surrounding suburbs

Mon–Sat 6:00 AM – 5:00 PM

Sat included at standard rate

0491 904 769

Text or call — same-day reply

Frequently asked

How quickly can you book us in for a Burleigh Heads site?

Same-week is normal. Often 24–48 hours out. Burleigh is in our weekly rotation — we're rarely full more than a couple of days ahead.

Do you cover Burleigh Waters and Miami too?

Yes. We treat the Burleigh Heads–Burleigh Waters–Miami–Varsity Lakes corridor as one operational area. No travel surcharge for jobs within it.

Can you handle multi-load fill removal?

Standard for us. The 10m³ bed clears most Burleigh subdivision spoil in 2–3 loads. We'll quote a flat estimate based on m³ if you have an excavator and rough volume figure.

What's the bond and deposit?

$200 flat deposit at booking, $2,000 bond pre-auth released on clean return. $5,000 insurance excess applies if there's a damage claim. Standard B2B civil terms.

Will you take green waste from Burleigh landscaping jobs?

Yes — green waste, mulch, garden waste, soil. Common combo with landscaping outfits in the Burleigh area. Tip fees passed through at cost.

Do I need to provide site induction paperwork?

We bring our own SWMS — the operator runs through it with your supervisor on arrival, signed on the operator's phone. Takes about 2 minutes. If you have a site-specific induction we'll do that too.

Are you insured for commercial sites?

Yes — $20M public liability cover (BizCover policy 118U557369BPK). We can email a Certificate of Currency before the job if your project requires it on file.

Need a tipper this week?

Send the job details — we'll text you back today with a firm quote and the next available slot.

Call NowGet a Quote